Wednesday, December 2, 2009

Off To The Machine Shop



I've been accumulating parts and finally took a minute to take a snapshot before most of them go off to the machine shop.  Here's what's I'm having done:

1. Bore and hone the cylinders 4.00 + 0.030" over
2. Align hone the main caps
3. Balance the rotating assembly (internally, hopefully)
4. Mock assembly to check/fix clearances

I'm also going to have the machinist take a look at the cylinder head with the dent (just to be sure.)

Oops, I may have got ahead of myself by ordering the 28oz. imbalance flywheel and damper.  I'm hoping the machinist can do an internal balance on the crank and I can use neutral components.  We'll see.

No comments:

Post a Comment